DeutschEnglish
Email

MODULAR DAM INSPECTION · DEVELOPMENT CONCEPT

Dam Guard – two dam faces, one coordinated inspection process

Investigating both upstream and downstream faces: Dam Guard proposes two separate sensor systems linked by surveyed inspection references. This is intended to support targeted cross-checks and traceable comparisons over successive inspections.

Inspection of both facesTargeted cross-checksRepeatable recordsWorldwide licensing

THE CENTRAL IDEA

What Dam Guard is intended to achieve

01

Link both sides

Separate systems inspect the upstream water-facing and downstream exposed surfaces. A shared positional reference relates their findings.

02

Follow up anomalies

If an anomaly is recorded on one face, the opposite system should be able to inspect the corresponding accessible area.

03

Compare over time

Inspection points, photographs and timestamps are retained in records for comparison with later surveys.

TECHNOLOGY EXPLAINED

System arrangement at the dam

Separate sensor units are intended to inspect the water-facing and exposed faces. The support structure requires site-specific engineering.

Dam Guard: tube system on the exposed dam face

Concept diagram of the dry-side arrangement, showing upper and lower tracks, two support cables, a transparent tube and one internal inspection carriage. The original drawing has German labels.
Approved concept diagram for the exposed, dry side of the dam. Not to scale; each dam requires its own site-specific design. The original German labels are explained below. Enlarge drawing

The diagram shows a possible arrangement on the dry, exposed face of a dam: an upper travelling trolley and a lower guide are intended to guide and stabilise the support structure carrying the transparent tube system. The two support cables, brackets and any intermediate guides require site-specific engineering.

One selected internal inspection carriage with a camera and task-specific sensors is proposed inside the tube. Cameras, LED lighting and additional modules are selected for the inspection task and accessible areas. The upper trolley and lower guide are separate components from the inspection carriage inside the tube.

The control system and supervisory computer are intended to bring together travel positions, images and findings. “Funk A/B” denotes the proposed redundant radio links. Clearance from the wall, tracks, fixings and the movable lower connection are adapted to each dam. The drawing depicts a lower trolley; a sliding guide shoe is an alternative requiring site-specific assessment.

Development concept: this diagram is not a construction design or proof of load-bearing capacity. Guidance, loads, fixings, communication and inspection performance require engineering verification and site trials.

English key to the German drawing labels
Obere / Untere Fahrbahn
Upper / lower track
Obere / Untere Laufkatze
Upper / lower travelling trolley
Zwei Tragseile und Trag-/Halterstruktur
Two support cables and support structure
Ein ausgewählter Innenlaufwagen
One selected internal inspection carriage
Steuerung / Leitrechner
Control system / supervisory computer
Funk A/B
Radio links A/B
Abstand individuell
Site-specific clearance
Mauerfläche
Dam face

PROPOSED WORKFLOW

From anomaly to cross-check

1

Detect

One sensor identifies an anomaly on an accessible face of the dam.

2

Record location

The control station assigns the finding to surveyed reference points and stores its measurement data.

3

Cross-check

The other system is intended to travel to the corresponding accessible inspection area.

4

Document change

Images and readings are archived with position, date and conditions for subsequent comparisons.

This cross-check is a proposed control process; simultaneous measurement is not essential. Accurate matching of locations requires on-site surveying and testing.

BUILDING BLOCKS

Proposed technology

Downstream / exposed side

Tube- or rail-guided inspection carriage with suitable cameras, lighting and optional range or laser sensors. Camera distance and image resolution must be validated on site.

Upstream / water-facing side

Separate winch carriage with an interchangeable pressure-rated sensor head. Underwater imaging, LED lighting and task-appropriate sonar are possible options.

Controls & data

Control station for surveyed location references, storage of imagery and readings, remote operation, planned communication redundancy and safe retrieval.

Operation & protection

Site-specific planning for weather, temperature, winter operation, sensor protection and safe stop conditions during faults.

ADAPTED TO THE STRUCTURE

Four proposed guidance layouts on the exposed face

01

Vertical guidance

Vertical tube section near the wall with defined clearance and one internal inspection carriage.

02

Concave / convex

Geometry-adapted tube route with spacers; bend negotiation and fastening need engineering trials.

03

Guided top and bottom

Upper and lower support or guide shoe for one tube system – explicitly only one inspection carriage.

04

Serpentine

Serpentine tube route intended to cover selected surface areas repeatedly; one carriage per tube system. Bend navigation needs testing.

These are alternative design concepts. Route, number of sections, clearances and mounting require site-specific engineering and safety review.

SUPPORT STRUCTURE

Rails, carriages and possible anchorage

Depending on the site, steel support members, rails, winches, anchorage plates and perhaps additional bearing structures may be considered. Any loading or modification of an existing dam crest needs dam-specific engineering assessment.

Concept drawing of a steel column and anchorage plate supported by an optional concrete pedestal on the dam crest.
Concept illustration of a possible optional pedestal, not a universal requirement. Need, dimensions, anchors and the connection to the existing structure must be engineered. German labels; tap to enlarge.Open full-size drawing ↗

PARTNERS WELCOME

Development and worldwide licensing

profokusline acts as concept developer and licensor. Dam operators, engineering firms, researchers, technology developers and manufacturers are invited to explore feasibility studies, detailed design and pilot testing.

View technical concept overview (PDF, German) ↗

Technical discussion or licensing enquiry

profokusline@gmail.com

Other systems and updates

Get in touch